I'm going to be installing a hard wired Surgeguard. Am I right in assuming the two lines on the right of the transfer switch are the incoming lines (genset and shore power) and the one on the left is the load side? Testing and common sense would indicate yes, but First hand experience is always helpful. I've also read where people have wired the Surgeguard in with plugs so if the Surgeguard fails, it can be easily bypassed. Not sure if that is a good idea or not. Suggestion/opinions? Anything else I should know about the install but not smart enough to ask?